Warning: mkdir(): No space left on device in /www/wwwroot/Z5.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/dabenche.com/cache/ff/aca92/76fa7.html): failed to open stream: No such file or directory in /www/wwwroot/Z5.com/func.php on line 115
燃煤好色先生在线观看鍋爐餘熱使用探討_公司好色先生APP下载地址_好色先生APP下载地址中心-濟南濟柴好色TV下载安装燃氣發電設備有限公司


  • 好色TV下载安装,好色先生在线观看,黄片APP好色先生,好色先生APP下载地址

    歡迎進入濟南濟柴好色TV下载安装燃氣發電設備有限公司官網!

    公司好色先生APP下载地址

    燃煤好色先生在线观看鍋爐餘熱使用探討

    返回 2021.12.31 來源:http://www.dabenche.com 0
    1、好色先生在线观看加裝板式換熱器。板式換熱器A 加裝在好色先生在线观看油冷卻係統中,高溫冷卻油由板式換熱器A1 角孔流入,冷水由A3角孔進入板式換熱器,進行熱交換後,低溫冷卻油從A2 角孔回流到好色先生在线观看,溫水由A4 角孔流入板式換熱器B;板式換熱器B 加裝在好色先生在线观看水冷卻係統上,高溫冷卻水由角孔B1 流入板式換熱器,與進入板式換熱器B 的溫水進行熱交換後回流到好色先生在线观看,熱水由B4 角孔流出。經過熱交換,由A3 角孔進入的常溫水,從B4 角孔流出後溫度在75 ~80 ℃。
    1. The generator set is equipped with plate heat exchanger. The plate heat exchanger a is installed in the oil cooling system of the generator set. The high-temperature cooling oil flows into the plate heat exchanger from the A1 corner hole, the cold water enters the plate heat exchanger from the A3 corner hole, and after heat exchange, the low-temperature cooling oil flows back to the generator set from the A2 corner hole, and the warm water flows into the plate heat exchanger B from the A4 corner hole; Plate heat exchanger B is installed on the water cooling system of the generator set. The high-temperature cooling water flows into the plate heat exchanger from corner hole B1, exchanges heat with the warm water entering plate heat exchanger B, and then flows back to the generator set, and the hot water flows out from corner hole B4. After heat exchange, the temperature of normal temperature water entering from A3 corner hole and flowing out from B4 corner hole is 75 ~ 80 ℃.
    2、供水管路設計。礦井高位水池通過閘閥12 向瓦斯好色先生在线观看冷卻水池供冷水,冷卻水池內冷水流向好色先生在线观看板式換熱器加熱,然後通過閘閥1 流入加裝保溫棉的保溫水箱內。在熱水使用低峰期可通過閘閥2、閘閥3流向冷卻水塔,對熱水冷卻降溫,然後循環使用。當保溫水箱內水溫降低時,可通過閘閥5 將低溫水回流到冷卻水池。正常用水時,關閉閘閥13,打開管道泵兩端閘閥,打開閘閥14 及水箱入口閘閥,使用綜合泵房內管道泵將保溫水箱內熱水排入澡堂水箱,供職工澡堂使用。當澡堂水箱內熱水溫度降低後,可通過閘閥13 將溫水回流到冷卻水池。
    2. Water supply pipeline design. The mine high-level water tank supplies cold water to the gas generator unit cooling water tank through the gate valve 12. The cold water in the cooling water tank flows to the generator unit plate heat exchanger for heating, and then flows into the thermal insulation water tank equipped with thermal insulation cotton through the gate valve 1. During the low peak period of hot water use, it can flow to the cooling water tower through gate valve 2 and gate valve 3, cool the hot water, and then recycle it. When the water temperature in the insulation water tank decreases, the low-temperature water can be returned to the cooling water tank through the gate valve 5. When using water normally, close the gate valve 13, open the gate valves at both ends of the pipeline pump, open the gate valve 14 and the gate valve at the inlet of the water tank, and use the pipeline pump in the comprehensive pump house to discharge the hot water in the thermal insulation water tank into the bathhouse water tank for use by the staff bathhouse. When the hot water temperature in the bathhouse water tank decreases, the warm water can be returned to the cooling pool through the gate valve 13.
    3、加裝自動控製。安裝溫控裝置對閘閥5 進行控製,在溫控開關上設置相應溫度,當水溫降低到設置溫度以下時閘閥5 打開,將冷水回流,重新通過餘熱利用裝置加熱。在澡堂水箱內安裝水位控製裝置並設置水位,當水位降低到水位時,相應閘閥打開,管道泵起動,向澡堂水箱加水;當澡堂水箱水位達到水位時,相應閘閥關閉,管道泵停止運行。增加澡堂水箱溫控裝置,澡堂水箱水溫降低時,通過閘閥13、閘閥14、閘閥15 或閘閥16 將低溫水回流,重新經過餘熱利用裝置加熱。通過加裝自動控製裝置,減少人工操作步驟,降低了人員投入和工人勞動強度。
    3. Add automatic control. Install a temperature control device to control the gate valve 5. Set the corresponding temperature on the temperature control switch. When the water temperature drops below the set temperature, the gate valve 5 opens to return the cold water and heat it again through the waste heat utilization device. Install a water level control device in the bathhouse water tank and set the water level. When the water level drops to the minimum water level, the corresponding gate valve opens and the pipeline pump starts to add water to the bathhouse water tank; When the water level of the bathhouse water tank reaches the maximum water level, the corresponding gate valve is closed and the pipeline pump stops running. Add a temperature control device for the bath water tank. When the water temperature of the bath water tank decreases, the low-temperature water will be refluxed through gate valve 13, gate valve 14, gate valve 15 or gate valve 16 and heated again by the waste heat utilization device. Through the installation of automatic control device, the manual operation steps are reduced, and the personnel input and labor intensity are reduced.、
    焦化好色先生在线观看
    4、創造的效益。好色先生在线观看餘熱利用係統正常運行後,該礦停止使用原有的2台4t 燃煤蒸汽壓力鍋爐,每年可節約燃煤2000 t,每年可減少燃煤鍋爐維修費用、各種檢驗檢測費用。
    4. Benefits created. After the waste heat utilization system of the generator set operates normally, the mine stops using the original two 4T coal-fired steam pressure boilers, which can save 2000 t of coal every year and reduce the maintenance cost and various inspection and testing costs of coal-fired boilers every year.
    使用燃煤鍋爐排放大量硫化物等汙染物,對環境造成汙染。瓦斯好色先生在线观看餘熱利用則為清潔能源,全程無汙染物的排放,具有極高的環保效益。燃煤蒸汽鍋爐使用壓力容器,具有一定的爆炸危險性,餘熱利用係統比原有的燃煤蒸汽壓力鍋爐更加安全。餘熱利用係統安裝後,提升了好色先生在线观看冷卻係統的冷卻效果,延長了部分配件的使用壽命。
    The use of coal-fired boilers releases a large number of sulfide and other pollutants, which pollutes the environment. The waste heat utilization of gas generator set is clean energy with no pollutant emission in the whole process, which has high environmental protection benefits. The coal-fired steam boiler uses pressure vessels, which has a certain explosion risk. The waste heat utilization system is safer and more efficient than the original coal-fired steam pressure boiler. After the installation of the waste heat utilization system, the cooling effect of the generator unit cooling system is improved and the service life of some accessories is prolonged.
    好色先生APP下载地址搜索
    濟南濟柴好色TV下载安装燃氣發電設備有限公司
    • 服務熱線

      0531-62325028
      0531-69951266

    燃煤好色先生在线观看鍋爐餘熱使用探討

    1、好色先生在线观看加裝板式換熱器。板式換熱器A 加裝在好色先生在线观看油冷卻係統中,高溫冷卻油由板式換熱器A1 角孔流入,冷水由A3角孔進入板式換熱器,進行熱交換後,低溫冷卻油從A2 角孔回流到好色先生在线观看,溫水由A4 角孔流入板式換熱器B;板式換熱器B 加裝在好色先生在线观看水冷卻係統上,高溫冷卻水由角孔B1 流入板式換熱器,與進入板式換熱器B 的溫水進行熱交換後回流到好色先生在线观看,熱水由B4 角孔流出。經過熱交換,由A3 角孔進入的常溫水,從B4 角孔流出後溫度在75 ~80 ℃。
    1. The generator set is equipped with plate heat exchanger. The plate heat exchanger a is installed in the oil cooling system of the generator set. The high-temperature cooling oil flows into the plate heat exchanger from the A1 corner hole, the cold water enters the plate heat exchanger from the A3 corner hole, and after heat exchange, the low-temperature cooling oil flows back to the generator set from the A2 corner hole, and the warm water flows into the plate heat exchanger B from the A4 corner hole; Plate heat exchanger B is installed on the water cooling system of the generator set. The high-temperature cooling water flows into the plate heat exchanger from corner hole B1, exchanges heat with the warm water entering plate heat exchanger B, and then flows back to the generator set, and the hot water flows out from corner hole B4. After heat exchange, the temperature of normal temperature water entering from A3 corner hole and flowing out from B4 corner hole is 75 ~ 80 ℃.
    2、供水管路設計。礦井高位水池通過閘閥12 向瓦斯好色先生在线观看冷卻水池供冷水,冷卻水池內冷水流向好色先生在线观看板式換熱器加熱,然後通過閘閥1 流入加裝保溫棉的保溫水箱內。在熱水使用低峰期可通過閘閥2、閘閥3流向冷卻水塔,對熱水冷卻降溫,然後循環使用。當保溫水箱內水溫降低時,可通過閘閥5 將低溫水回流到冷卻水池。正常用水時,關閉閘閥13,打開管道泵兩端閘閥,打開閘閥14 及水箱入口閘閥,使用綜合泵房內管道泵將保溫水箱內熱水排入澡堂水箱,供職工澡堂使用。當澡堂水箱內熱水溫度降低後,可通過閘閥13 將溫水回流到冷卻水池。
    2. Water supply pipeline design. The mine high-level water tank supplies cold water to the gas generator unit cooling water tank through the gate valve 12. The cold water in the cooling water tank flows to the generator unit plate heat exchanger for heating, and then flows into the thermal insulation water tank equipped with thermal insulation cotton through the gate valve 1. During the low peak period of hot water use, it can flow to the cooling water tower through gate valve 2 and gate valve 3, cool the hot water, and then recycle it. When the water temperature in the insulation water tank decreases, the low-temperature water can be returned to the cooling water tank through the gate valve 5. When using water normally, close the gate valve 13, open the gate valves at both ends of the pipeline pump, open the gate valve 14 and the gate valve at the inlet of the water tank, and use the pipeline pump in the comprehensive pump house to discharge the hot water in the thermal insulation water tank into the bathhouse water tank for use by the staff bathhouse. When the hot water temperature in the bathhouse water tank decreases, the warm water can be returned to the cooling pool through the gate valve 13.
    3、加裝自動控製。安裝溫控裝置對閘閥5 進行控製,在溫控開關上設置相應溫度,當水溫降低到設置溫度以下時閘閥5 打開,將冷水回流,重新通過餘熱利用裝置加熱。在澡堂水箱內安裝水位控製裝置並設置水位,當水位降低到水位時,相應閘閥打開,管道泵起動,向澡堂水箱加水;當澡堂水箱水位達到水位時,相應閘閥關閉,管道泵停止運行。增加澡堂水箱溫控裝置,澡堂水箱水溫降低時,通過閘閥13、閘閥14、閘閥15 或閘閥16 將低溫水回流,重新經過餘熱利用裝置加熱。通過加裝自動控製裝置,減少人工操作步驟,降低了人員投入和工人勞動強度。
    3. Add automatic control. Install a temperature control device to control the gate valve 5. Set the corresponding temperature on the temperature control switch. When the water temperature drops below the set temperature, the gate valve 5 opens to return the cold water and heat it again through the waste heat utilization device. Install a water level control device in the bathhouse water tank and set the water level. When the water level drops to the minimum water level, the corresponding gate valve opens and the pipeline pump starts to add water to the bathhouse water tank; When the water level of the bathhouse water tank reaches the maximum water level, the corresponding gate valve is closed and the pipeline pump stops running. Add a temperature control device for the bath water tank. When the water temperature of the bath water tank decreases, the low-temperature water will be refluxed through gate valve 13, gate valve 14, gate valve 15 or gate valve 16 and heated again by the waste heat utilization device. Through the installation of automatic control device, the manual operation steps are reduced, and the personnel input and labor intensity are reduced.、
    焦化好色先生在线观看
    4、創造的效益。好色先生在线观看餘熱利用係統正常運行後,該礦停止使用原有的2台4t 燃煤蒸汽壓力鍋爐,每年可節約燃煤2000 t,每年可減少燃煤鍋爐維修費用、各種檢驗檢測費用。
    4. Benefits created. After the waste heat utilization system of the generator set operates normally, the mine stops using the original two 4T coal-fired steam pressure boilers, which can save 2000 t of coal every year and reduce the maintenance cost and various inspection and testing costs of coal-fired boilers every year.
    使用燃煤鍋爐排放大量硫化物等汙染物,對環境造成汙染。瓦斯好色先生在线观看餘熱利用則為清潔能源,全程無汙染物的排放,具有極高的環保效益。燃煤蒸汽鍋爐使用壓力容器,具有一定的爆炸危險性,餘熱利用係統比原有的燃煤蒸汽壓力鍋爐更加安全。餘熱利用係統安裝後,提升了好色先生在线观看冷卻係統的冷卻效果,延長了部分配件的使用壽命。
    The use of coal-fired boilers releases a large number of sulfide and other pollutants, which pollutes the environment. The waste heat utilization of gas generator set is clean energy with no pollutant emission in the whole process, which has high environmental protection benefits. The coal-fired steam boiler uses pressure vessels, which has a certain explosion risk. The waste heat utilization system is safer and more efficient than the original coal-fired steam pressure boiler. After the installation of the waste heat utilization system, the cooling effect of the generator unit cooling system is improved and the service life of some accessories is prolonged.
    網站地圖